Home About Case Studies Products Support Contact Site Map

Software Lifecycle - Production

Measuresoft Logo

Applications
Lifecycle

User Requirements
S/W Requirements
Physical Design
Production
Transfer
Maintenance

 
1. Entry Criteria
2. Main Tasks
3. Deliverables
4. Verification
5. Exit Criteria
PDD

Integration Test Specification

System Tests Specification

Coding standards

ATP

Approved Phase Plan

Detailed design
  • Pseudo code
  • Review DD

Produce code, help and setups

Unit testing

User documentation

Integration Testing

System Testing

Develop Transfer Phase Plan

Review

Detailed design

Code, exe’s, setups and help files

Inspection report

Help files and user manuals

Integration test results

System test results

Acceptance test specification

Transfer Phase Plan

Audit deliverables

Peer code reviews

Walkthroughs

Inspections

Estimate of subsequent phases

Signoff of deliverables by M.D or Project Manger as required.